The basement redo to convert it from a dungeon to an artspace continues. Two thirds is done. The suspended ceiling is out, the ceiling primed and painted, and the longarm is swaddled in drop cloths. All the shelves and cabinets are shoved together for now.
The last portion was started today. The ceiling has been primed. I really need to get some quilts done as my last two quilted comfort quilts went out last week.The longarm is facing towards you from the left end. This portion is done.
Coming down the stairs. The exposed pipe had a suspended bulkhead ... |